AI-native execution layer

Vela reads the systems a large-load project already runs on and unifies them into one live operating model. It tracks what changed, works out what the change touches, and routes it to the people it lands on.

You don't have to move anything.

Everything the model needs, the project already produces. The delivery position is sitting in a supplier thread. The erection sequence is in a drawing revision. The need-by date is in a register nobody has opened since July. Vela reads them where they are and leaves them there.

  • Connect the systems you already pay for
  • Nothing gets moved or re-entered
  • You set the scope per workspace
  • Every value keeps a way back to its source

Connected systems

4 reading

Gmail, Google Drive, Google Sheets, and Google Calendar feed one live model, and what comes out is staged work — an update, an impact, a drafted reply — held for a person. Writing back to any system is a separate permission you grant.

What Vela reads

You choose what Vela can see.

Vela reads Gmail, Google Drive, Google Sheets and Google Calendar today. The rest of the list is in development or open by request. You pick the folders, mailboxes and calendars per workspace and see the full scope before anything connects, so nobody finds out later that a folder above the project was in range.

  • Four systems reading today, with the full list on the connectors page
  • You choose the folders, mailboxes and calendars
  • Writing back to a system is a permission you grant separately

Access scope

Per workspace
MailboxesThe three project threads you nameRead
Drive foldersDesert Ridge Storage, and nothing above itRead
Equipment registerLong-lead tabRead, write on request

You pick the scope per workspace, and you see the whole list before anything connects.

What Vela gets out of them

What changed, down to the field.

A slipped delivery arrives as four sentences in an email. What the project needs out of it is the two dates that moved, the float that changed because of them, and a way back to the message. Vela carries the locator along with the value, so anything on screen can be traced to the document it came out of.

  • Named fields instead of a folder of new files
  • Derived values show the arithmetic behind them
  • Every field carries its document and the place inside it

One thread, read four ways

Ready to ship28 Sep 2026 → 26 Oct 2026Moved
On site26 Oct 2026 → 23 Nov 2026Moved
Float to need-by11 days → 17 days lateDerived
SourceRE: GSU-01 reserved slot — revised delivery positionGmail

A supplier writes a paragraph. The project needs four fields out of it, and a way back to the sentence each one came from.

Who it reaches

The people the change actually lands on.

A slipped date rarely costs a month because nobody knew. It costs a month because the three people it touches each found out separately, a week apart. Vela holds who owns what, so the procurement manager, the interconnection lead and the owner's engineer all see it the same morning.

  • The record knows who owns each milestone
  • Outside engineers and lenders get a view without an account
  • Access is set per person

Who sees the change

Ana DuarteProcurement ManagerOwns the decision
Priya RamanInterconnection LeadEnergization date
Hollis TrentOwner's Engineer, Saguaro Line EngineeringRead-only

An outside engineer gets the view without getting an account. Access is set per person.

How a change flows through

One email, followed all the way down.

On 24 Jul 2026 Meridian's revised delivery position lands in the Desert Ridge inbox. Here is what the execution layer does with it, and where it stops.

1

A message lands

Meridian moves ready to ship from 28 Sep to 26 Oct 2026. It arrives as four sentences in a supplier thread, the way real slips do.

Gmail · 24 Jul 2026
2

The model catches the contradiction

The equipment register still says on site 26 Oct 2026, the day the machine now leaves the factory. The gap is flagged, not silently overwritten.

Long-lead tab, row 12
3

The impact is walked downstream

Rev 7 sets 6 Nov 2026 as the latest GSU-01 can land. On site on 23 Nov leaves it 17 days late, on a path that ends at energization on 14 May 2027.

Float: 17 days late
4

It reaches the right people, then stops

Ana Duarte gets the decision, Priya Raman sees the energization date at risk, and the register edits are staged for Dana Whitfield. Nothing is written until she approves.

Awaiting approval

Bring the systems you already use.

We'll go through what your project produces today, what Vela can read from it, and what it would take to have the model running against a live site.