Vela products

Equipment & procurement

Start with the design basis, then test each equipment path against it.

See Vela at work

Equipment & procurement

Review equipment against the project.

Vela reads the project's requirements first, then checks orders, supplier records and public listings against that basis. Missing information stays missing. A candidate stays listed for engineer review until the team confirms what it needs to.

Find transformer paths for phase one.

For TX-01, Vela reads NAC-EQ-118 Rev 05, NAC-E-105 Rev 06 and PO-24017, then the public listings from CTG Power Systems, Sunbelt Solomon and Maddox. Samir Shah reviews the comparison.

Which listed transformers could work for the 40 MW phase, and what would we need to confirm?

Northstar 300 MW AI CampusShared project

Equipment has to match the project.

Vela already holds what the project decided about TX-01: the datasheet, the one-line, the protection study, the date it is needed. Its agents open reseller sites in cloud browsers and read each listing against that.

  1. 1Vela opens TX-01 and recalls what the project decided about it.
  2. 2Cloud agents open reseller sites and read every listing.
  3. 3A listed rating is checked against the load in the basis.
  4. 4A unit with no on-load tap changer is set aside.
  5. 5A different impedance reaches the protection study, so Vela flags it.
  6. 6What it read, where, and what to ask stays on TX-01.

TX-01 · 138/34.5 kV, 75/100 MVA

  • Voltage and terminalsTTE, 69/92/115 MVA, new: 138 / 34.5 kV with a 13.8 kV tertiaryBasis 138 / 34.5 kV, NAC-EQ-118 Rev 05Tertiary is not in the design. Engineer reviewAsked the seller whether the tertiary can stay unloaded
  • A second resellerSunbelt Solomon, ready to ship: substations listed as a category, no unit ratings on the pageBasis 138/34.5 kV, 75/100 MVA, NAC-EQ-118 Rev 05Nothing on the page to compareQuote request drafted for a person to review
  • Rating and coolingTTE, 69/92/115 MVA, new: ONAN / ONAF1 / ONAF2Basis 75 MVA ONAN, 100 MVA ONAF, NAC-EQ-118 Rev 05Base stage is 6 MVA under. Engineer reviewKept for review, with the load case attached
  • Ratio and tapsWaukesha, 30 to 56 MVA, built 2003: five de-energized taps, 131.1 to 144.9 kVBasis on-load taps ±10%, NAC-E-105 Rev 06No on-load tap changer. Outside basisSet aside, and the reason kept on TX-01
  • ImpedanceWaukesha, 30 to 56 MVA, built 2003: 9.69%Basis 9.25%, NAC-E-214 Rev 030.44 points higher. Protection study flaggedOpened a question on NAC-E-214 for the engineer
  • Vector groupTTE, 69/92/115 MVA, new: YNyn0+dBasis Dyn1, NAC-E-105 Rev 06Differs from the basis. Engineer reviewOpened a question on NAC-E-105 for the engineer
  • Design basisNAC-EQ-118 · Rev 05
  • Public listings read2 kept for review, 1 set asideCTG Power Systems, public inventory, 20 Sep 2026
  • Questions for the sellerNameplate, test report, outlineDrafted for review
  • TX-01 on site, 6 Nov 2026NAC-PROC-2210

Illustrative TX-01 model and design basis. Geometry is representative, not a manufacturer's arrangement. Candidate values are from CTG Power Systems, public inventory, and the Sunbelt Solomon ready-to-ship page, both public and read 20 Sep 2026. Vela has no affiliation with either. A listing is not confirmed availability.

Review the sources and the proposed changes.

01

Read the project requirement.

Vela pulls 138/34.5 kV, 75/100 MVA, Dyn1, ±10% taps and 9.25% impedance from the project record.

02

Read each published source.

Vela records only the values shown on the page, including CTG's listed 138/34.5/13.8 kV and 69/92/115 MVA ratings.

03

Stage the engineer review.

Vela shows which characteristics differ, which are missing, and what Samir Shah needs confirmed before a candidate stays under consideration.

Get to know Vela.

Meet the team behind Vela and learn what we're building for power infrastructure.

An introductory conversation. No preparation needed.