Read the study change.
Vela records the revised 34.5 kV bus fault duty of 33.8 kA and the stated 40 kA switchgear minimum.
Utility changes stay connected to the equipment and activities they can affect.
See Vela at workUtility & interconnection
Vela compares utility study revisions and follows changed requirements into the design and the active orders. Each finding stays tied to the source study and to the project records that need review.
Vela compares ONC-FS-104 Rev 04 with Rev 03, then checks the 40 kA switchgear minimum against NAC-E-214 Rev 03, NAC-EQ-221 and PO-24031. Jordan Lee reviews the interconnection finding.
What changed in the utility's revised study, and does it affect equipment we've already ordered?
A restudy is one clause in a long document. Vela traces it to the equipment it rules out, and to every record that has to change with it.

Northstar 300 MW AI Campus · 138 / 34.5 kV substation
Illustrative substation and single-line. The arrangement and the equipment are representative, not the design of a specific site.
Vela records the revised 34.5 kV bus fault duty of 33.8 kA and the stated 40 kA switchgear minimum.
The new issue is linked to SG-01, the protection study, the switchgear submittal and the active order.
Vela prepares the affected records and open checks for Jordan Lee before anyone changes a design or a supplier instruction.
Meet the team behind Vela and learn what we're building for power infrastructure.
An introductory conversation. No preparation needed.
We use analytics cookies to understand how people use this site. They are not required for it to work, and we do not set them unless you agree. Cookie Policy